Skip to main content

You've searched: All Collections

  • All fields: 09/11/2009
(3 results)



Display: 20

    • Davidson Mathematics and Science Center construction, 09/11/2009

    • Buildings/sites; Building construction; Catching light;
    • A construction lantern reveals a dimly lit hallway. The Davidson Mathematics and Science Center, finished in 2010, is a 100,000-square-foot modern teaching and research facility. It houses the Nell. J. Redfield Foundation Auditorium, 27...
    • Davidson Mathematics and Science Center construction, 09/11/2009

    • Buildings/sites; Building construction; Catching light;
    • An inside look through a future doorway reveals a large room. The Davidson Mathematics and Science Center, finished in 2010, is a 100,000-square-foot modern teaching and research facility. It houses the Nell. J. Redfield Foundation Auditorium, 27...
    • Center for Molecular Medicine construction, 09/11/2009

    • Buildings/sites; Medicine; Building construction;
    • This photograph shows the bare steel structure of the north side of the building. The Center for Molecular Medicine was finished in 2010. It houses many medical departments ranging from pharmacology to biotechnology and includes both teaching and...

QuickView

Display a larger image and more item information when the pointer pauses over a thumbnail
 

Layout options:

Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK