Skip to main content

You've searched: All Collections

  • All fields: 08/20/2007
(3 results)



Display: 20

    • Mathewson-IGT Knowledge Center construction, 08/20/2007

    • Building construction; Buildings/sites; Libraries;
    • A view from the roof shows pieces of the stairways leading up to the side of the library being built. The Mathewson-IGT Knowledge Center opened in 2008 as the new $75.3 million, 295,000-square-foot, technology-focused library. Named for its...
    • Mathewson-IGT Knowledge Center construction,  08/20/2007

    • Building construction; Buildings/sites; Libraries;
    • The library plans are propped up in display with a baseball cap placed on the edge of the plans. The Mathewson-IGT Knowledge Center opened in 2008 as the new $75.3 million, 295,000-square-foot, technology-focused library. Named for its largest...
    • Mathewson-IGT Knowledge Center construction, 08/20/2007

    • Building construction; Buildings/sites; Libraries;
    • Red construction elbows are piled together at the construction site. The Mathewson-IGT Knowledge Center opened in 2008 as the new $75.3 million, 295,000-square-foot, technology-focused library. Named for its largest benefactors, the Mathewson...

QuickView

Display a larger image and more item information when the pointer pauses over a thumbnail
 

Layout options:

Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK